Java8期間及持續時間
使用Java8,兩個專門類引入來處理時間差。
Period - 處理有關基於時間的日期數量。
Duration - 處理有關基於時間的時間量。
讓我們來看看他們的操作。
選擇使用任何編輯器創建以下java程序在 C:/> JAVA
Java8Tester.java
import java.time.LocalDate; import java.time.LocalTime; import java.time.temporal.ChronoUnit; import java.time.Duration; import java.time.Period; public class Java8Tester { public static void main(String args[]){ Java8Tester java8tester = new Java8Tester(); java8tester.testPeriod(); java8tester.testDuration(); } public void testPeriod(){ //Get the current date LocalDate date1 = LocalDate.now(); System.out.println("Current date: " + date1); //add 1 month to the current date LocalDate date2 = date1.plus(1, ChronoUnit.MONTHS); System.out.println("Next month: " + date2); Period period = Period.between(date2, date1); System.out.println("Period: " + period); } public void testDuration(){ LocalTime time1 = LocalTime.now(); Duration twoHours = Duration.ofHours(2); LocalTime time2 = time1.plus(twoHours); Duration duration = Duration.between(time1, time2); System.out.println("Duration: " + duration); } }
驗證結果
使用javac編譯器編譯如下類
C:\JAVA>javac Java8Tester.java
現在運行Java8Tester看到的結果
C:\JAVA>java Java8Tester
看到結果。
Current date: 2014-12-10
Next month: 2015-01-10
Period: P-1M
Duration: PT2H